Mercury XR2 Instrukcja Instalacji Strona 21

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 21
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 20
- 21 -
Pre-delivery Inspection
Not Check/
Applicable Adjust CHECK BEFORE RUNNING
Water hose connection/torqued
Cover plate & adaptor plate
fasteners torqued
Battery charged & secure
All electrical connections tight
All fuel connections tight
Throttle, shift, & steering adjusted
correctly and fasteners torqued
Shift cable adjusted to keep
reverse gate 9.5 to 12.7 mm
(3/8-1/2 in.) above
rudder in forward w/ slack pulled
out of cable
Carb throttle shutters open
& close completely
Pump housing oil level full
(See Owner’s Manual)
Oil injection reservoir full and bled
Warning system operational
On the water test
Starter neutral safety switch
operational
Lanyard stop switch operational
All gauges read properly
No fuel or oil leaks
No water leaks
No exhaust leaks
Ignition timing set to specs
Idle:____________RPM
Idle mixture adjusted
On the water test (continued)
Not Check/
Applicable Adjust
Forward-Neutral-Reverse
operational
Steering operational throughout
entire range
Acceleration test
WOT:___________RPM
Boat handling
Post water test
No fuel, oil, water or exhaust
leaks
Re-torque adapter plate fasteners
Re-check shift cable adjustment.
Readjust as necessary
Przeglądanie stron 20
1 2 ... 16 17 18 19 20 21

Komentarze do niniejszej Instrukcji

Brak uwag