Mercury 200 Optimax Dokumentacja Strona 122

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 121
OUTBOARD INSTALLATION
110 eng
2. Thread the lifting eye into the flywheel hub for a minimum of
five turns.
a - Lifting eye
3. Connect a hoist to the lifting eye.
4. Lift the outboard and place it on the boat transom.
Lifting Eye
91‑90455‑‑1
2756
Threads into the flywheel to
remove the powerhead
assembly from the driveshaft
housing, or to lift entire engine
for removal/installation.
Steering Cable ‑ Starboard Side Routed Cable
1. Lubricate O‑ring seal and entire cable end.
3724
95
Tube
Ref No.
Description Where Used Part No.
95
2-4-C with
PTFE
O-ring seal and entire cable
end
92-802859A 1
a
28495
Przeglądanie stron 121
1 2 ... 117 118 119 120 121 122 123 124 125 126 127 ... 148 149

Komentarze do niniejszej Instrukcji

Brak uwag